PRODUCTS
FibarSystem 300

Low cost drainage

FibarSystem 200

Drainage for wet climates

FibarSystem 100

Drainage for dry climates

CUSTOMER SERVICE

 

 

 

 

 

 

Price Quotation Request

I would like a price quote on the following Fibar® Engineered Wood Fiber
Playground Safety Surface products:

FibarSystems — Engineered Wood Fiber plus a Patented Drainage System

Fibar Bulk Engineered Wood Fiber (EWF) Number of cubic yards:

Fibar Top-off — Bulk Engineered Wood Fiber (EWF) inches.

FibarQuick — Fibar Top-off delivered and installed by Express Blower Truck (where available)

Please tell us about your playground project:   *Required if any product aboved is selected.

*Is the playground already built? YES NO

*Playground Area:  sq. ft.  or  Playground Dimensions:  ft.  X  

*For new playgrounds—Fibar Engineered Wood Fiber fill-depth:   


Please send me a price quote on the following Fibar® Safety Surface products:

FibarMat — Wear mats for hard-use areas   *Required if FibarMat is selected

FibarMat wear mats

Note:  FibarMat wear mats at slide exits, under all swings and tire swings [except enclosed or bucket tot swings] ensure compliance with the Federal Accessibility Law effective March 15, 2012.

Number of swings:   Number of slides:     *Total Mats:

FibarGuard — Playground Borders   *Required if FibarGuard is selected

FibarGuard Playground Borders

*Select one:   12" black border"   8" gray stone-like border

*Perimeter:   Linear Feet     ADA Ramps (Available for black borders only.)

Note: An ADA ramp ensures compliance with the Federal Accessibility Law effective March 15, 2012.

Fibar for Dog Parks— Bulk Engineered Wood Fiber   *Required if Fibar for Dog Parks is selected

Fibar for Dog Parks

*Is the dog park already built: YES   NO

*Dog Park Area:  sq. ft.  or  Dog Park Dimensions:     ft. X   ft.

Fibar Engineered Wood Fiber fill depth:

FibarIndoor — Carpet or Rubber over Engineered Foam   *Required if FibarIndoor is selected

FibarIndoor

*Is the play area already built: YES   NO

*Play Area:  sq. ft.  or  Play Area Dimensions:   ft. X   ft.

FibarPIP — Seamless Poured-in-Place Recycled Rubber with a Choice of 13 Colors

FibarPIP Seamless Poured-in-Place Recycled Rubber

Clicking on the FibarPIP checkbox will display additional questions about your project.
Tell us if you would like help answering the questions from a Fibar Respresentative:

YES, I would like help.  NO, thank you.

 

Please tell us about your FibarPIP project:   *Required
*Access to water: Yes No Don't know
*Access to electric: Yes  No Don't know
*Security provided by others: Yes No Don't know
*7-day, 24-hour project access: Yes No  Don't know
*Excavation required: Yes No Don't know
*Sub-base required: Yes  No Don't know
*Financial bonding required: Yes No Don't know
If yes, indicate type: Bid Performance   Payment
*Surface Material Thickness / Critical Height:
  1.75"/3'  2.0"/4'  2.5"/5'  3.0"/6'  3.5"/8'  4.0"/9'  4.5"/10'
*Wages:           Prevailing wage  Regular wage  **Other  Don't know

**Please provide details about "Other" wages below:

 

Area 1
*Total Square Feet:  
 
*Binder: Aliphatic Don't know
*Sub Base Type:
*Turndown: Yes
*Saw Cutting: Yes No Don't know
*Logo Designs: Yes Don't know
Select your colors from the chart below or click the View Colors Larger for bigger swatches. If you have more than one defined area in your design, use the additional Area forms provided below.
Area 1 Colors %
Area 2
Total Square Feet:  
 
Binder: Aliphatic Don't know
Sub Base Type:
Turndown: Yes
Saw Cutting: Yes No Don't know
Logo Designs: Yes Don't know
Area 2 Colors %
Area 3
Total Square Feet:  
 
Binder: Aliphatic Don't know
Sub Base Type:
Turndown: Yes
Saw Cutting: Yes No Don't know
Logo Designs: Yes Don't know
Area 3 Colors %
Please provide us with your contact information:     *Required
 
*First Name  
*Last Name  
Title  
*Facility Type School/Park Playground    Residential Playground     Dog Park
School/Park Name    (please skip if residential playground)
*Address
*City *State   *Zip
*Phone Extension
*Email
*Our priority for our project is: Immediate 6 to 12 months Future/file
Best time to call:   8 AM-10 AM 10 AM-12 PM 12 PM-2 PM 2 PM-4 PM 4 PM-6 PM
   
Comments: